Past a state's legal width, height, length or weight, the load needs a permit for that state. Give us the dimensions and the route — we work out where you're over, price each state, and file them.
These are the federal baselines on the Interstate System. They are the number most people quote, and they are not the number you are held to — every state sets its own limits on its own roads, and the weight you can carry also depends on how your axles are spaced.
| Federal baseline | Limit |
|---|---|
| Width | 8' 6" (102 inches) |
| Height | 13' 6" (many states allow 14') |
| Length, semi-trailer | 48'–53', set by state |
| Gross weight | 80,000 lbs on the Interstate System |
| Single axle | 20,000 lbs |
| Tandem axle | 34,000 lbs |
Width and gross weight are the same in all 51 states we cover — 102 inches and 80,000 lbs. If you are over on either, you are over everywhere. What changes at a state line is height, trailer length and what the axles may carry.
So a load can clear one state and need a permit in the next on height or axle weight alone. Each state's full table — including overhangs and single, tandem and tridem axles — is on its state page.
Enter the load's length, width, height and gross weight once. Every state on the route is checked against its own legal limits, and an oversize or overweight permit is added wherever you exceed them — with a note saying which limit you crossed and by how much.
It is the most useful thing the software does, and it is the thing carriers most often get wrong. A load that ran legal last month can be over this month because you changed trailers.
An OS/OW permit is not just permission — it is a set of conditions, and they are the state's, not ours.
The state approves specific roads, chosen around bridges, clearances and construction. Leaving the permitted route voids the permit.
Daylight only in many states, with curfews through rush hour, weekends and holidays, and hard stops for high wind or poor visibility.
Pilot cars front, rear or both past certain dimensions — police for the largest moves — plus flags, banners and lights. You arrange and pay for escorts separately.
Oversize and overweight permits exist for loads that cannot be made smaller — a transformer, an excavator, a beam. If a load could reasonably be split into two legal loads, states expect you to split it rather than permit it. The federal test is roughly that taking it apart would damage it, destroy its value, or take more than about eight work hours.
Superloads are the far end of the same scale — very roughly past 16 feet wide or high, or into the hundreds of thousands of pounds, with each state drawing its own line. They need engineering review, bridge analysis and sometimes a physical route survey, so they take days or weeks and are quoted by hand. Call us early on one of those.